AMES, Iowa – Aug. 8, 2025 – Tell us what you think about proposed improvements to U.S. 30 from 590th Avenue to County Road S14 in Nevada.
Changes include:
- New interchange at 610th Avenue/Airport Road
- Reconstruction and paving of West Maple Avenue east of 610th Avenue
- Construct extension of West A Avenue west of 610th Avenue
- Close access at 590th and 600th Avenues and 6th Street
During the construction of the U.S. 30 and 610th Avenue interchange, traffic on 610th Avenue will be detoured using County Rd E41/Lincoln Highway, 600th Avenue, and West Maple Avenue. Construction is expected to start spring of 2028 and end fall of 2030.
ATTEND OPEN HOUSE TO SHARE YOUR FEEDBACK
When: Thursday, August 14, 2025, anytime between 5 and 6:30 pm
Location: Nevada City Hall, 1209 6th Street, Nevada, Iowa 50201
Description: You will be provided with information about the project, and you can talk through your ideas with our staff. There will be no formal presentation. The meeting space is accessible for people with disabilities. If you require more support at the meeting, please notify the contact listed below by Tuesday, August 12, 2025.
SHARE YOUR FEEDBACK BY AUGUST 25
Not able to attend the open house? Learn about the project and share your feedback online (https://bit.ly/iowadot6806). You will need to provide your name and zip code before commenting.
For questions about the project or for free translation services, contact:
Shelby Ebel, District Transportation Planner,
Iowa DOT District 1 Office
1020 South 4th St., Ames, Iowa 50010
Phone 515-239-1996 or 800-899-0623 email Shelby.Ebel@iowadot.us
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.